well my new av room began last week with me and the brother in law doing the donkey work, knocking down the old lean too, breaking up the concreate floor which the last owner laid about a foot deep around the edge which was swine to get up.
after all the concreate up we started on doing the ground work for the floor and footings a hell of lot of soil came out well the we finished the footings mike the builder who is my brother in law aswell came round to see if everything was ok got the thumbs up. concrete came yesterday for the footings and materials for mike to get started which as done to day.will post more pictures.
the room size will be 5m x 4.5m
after all the concreate up we started on doing the ground work for the floor and footings a hell of lot of soil came out well the we finished the footings mike the builder who is my brother in law aswell came round to see if everything was ok got the thumbs up. concrete came yesterday for the footings and materials for mike to get started which as done to day.will post more pictures.
the room size will be 5m x 4.5m