Microsoft Visio 2007 Gantt charts

Discussion in 'Computer Software & Operating Systems' started by drinkofengland, Nov 27, 2010.

  1. drinkofengland

    drinkofengland
    Standard Member

    Joined:
    Nov 4, 2009
    Messages:
    1
    Products Owned:
    0
    Products Wanted:
    0
    Trophy Points:
    1
    Ratings:
    +0
    I'm creating a gantt chart which spans over the christmas period and from the 24th of december to 3rd of january, our site will be non-productive. As such i want to split the tasks or create a non-productive week. I've scouted all over the internet and its doing my head in. I can't believe that a gantt chart would not have the facility to introduce a non-productive week.

    Sam
     
  2. Mr Incredible

    Mr Incredible
    Distinguished Member

    Joined:
    Dec 2, 2003
    Messages:
    23,918
    Products Owned:
    2
    Products Wanted:
    0
    Trophy Points:
    166
    Location:
    The Fylde Coast
    Ratings:
    +13,617
    I don't think Visio is the right tool for that level of refinement. You may need to think about MS Project if you have access to it.
     
  3. tvmcp

    tvmcp
    Active Member

    Joined:
    Oct 2, 2009
    Messages:
    1,249
    Products Owned:
    1
    Products Wanted:
    0
    Trophy Points:
    66
    Location:
    Basingstoke
    Ratings:
    +232

Share This Page

Loading...