Distinguished Member
This one is more for the Plumbers who frequent this forum as opposed to a "lets have a pop at the prices Tradesmen charge" thread.
I know this is difficult for you guys to gauge without actually looking at the job first hand but i am really just looking for guidance more than anything else..
Basically i have an old boiler that is feeding a Gravity system with all the Tanks located within the loft space and i would like this replaced with a Combi boiler the one i have been looking at is the Worcester 30 CDI but with future expansion in mind and depending on final price would like to go for the 37 CDI.
As the system itself is quite old i would like to install a Fernox TR1 filter and would need 7xTRVs on the downstairs Rads fitted to comply with Regs. Also to comply with Regs i will need to have the Gas pipe from my meter to the Boiler replaced, after discussion with a plumber and to minimise disruption to decor I have decided to have the gas pipe run externally.
Basically the quote i have been given today is for £4310.93 inc

Just doing a little sourcing on line and using the very little knowledge i have. I have thrown together this estimate
Prices for Boiler, Flue kit, fernox filter, and TRVs from Plumbtraders
Prices for copper fittings from Screwfix, copper fittings estimated
Worcester Boiler 30 cdi £844.80 x1 £844.80
Horizontal flue kit for above £67.44 x1 £67.44
Fernox TF1 £77.52 x1 £77.52
Danfoss RAS C2 £12.97 x7 £90.79
28mm Copper Tube Bundle £114.95 x2 £229.90
22mm Copper Tube Bundle £154.90 x1 £154.90
28mm & 22mm Fittings £75 x1 £75
Total inc VAT £1540.35
Miscellaneous 10% £150
Labour 2 x men for 3 days @ £250 per day per man £1500.00
Total Inc VAT £3190.35
I guess the question is am i being unreasonable with the price and time scale in my estimate for the labour?
Am i missing some big items in my estimate?
I have allowed 28mm tube for the gas run but that is for normal copper tube, Should I have been looking for a thicker walled copper tube as its run externally?
Generally why is their over a £1000 difference between my estimate and their quote?
Sorry for the long post but just thought i would ask the question on an AV forum
before i went back to them. I have also contacted a national chain of plumbers a quote and will be asking at work tomorrow if anyone has a plumber they would recommend so i can get a quote from them.
Also if anyone here knows of or is a plumber in the Nottingham area then recommendations are welcome.
Thanks in advance.
I know this is difficult for you guys to gauge without actually looking at the job first hand but i am really just looking for guidance more than anything else..
Basically i have an old boiler that is feeding a Gravity system with all the Tanks located within the loft space and i would like this replaced with a Combi boiler the one i have been looking at is the Worcester 30 CDI but with future expansion in mind and depending on final price would like to go for the 37 CDI.
As the system itself is quite old i would like to install a Fernox TR1 filter and would need 7xTRVs on the downstairs Rads fitted to comply with Regs. Also to comply with Regs i will need to have the Gas pipe from my meter to the Boiler replaced, after discussion with a plumber and to minimise disruption to decor I have decided to have the gas pipe run externally.
Basically the quote i have been given today is for £4310.93 inc
Just doing a little sourcing on line and using the very little knowledge i have. I have thrown together this estimate
Prices for Boiler, Flue kit, fernox filter, and TRVs from Plumbtraders
Prices for copper fittings from Screwfix, copper fittings estimated
Worcester Boiler 30 cdi £844.80 x1 £844.80
Horizontal flue kit for above £67.44 x1 £67.44
Fernox TF1 £77.52 x1 £77.52
Danfoss RAS C2 £12.97 x7 £90.79
28mm Copper Tube Bundle £114.95 x2 £229.90
22mm Copper Tube Bundle £154.90 x1 £154.90
28mm & 22mm Fittings £75 x1 £75
Total inc VAT £1540.35
Miscellaneous 10% £150
Labour 2 x men for 3 days @ £250 per day per man £1500.00
Total Inc VAT £3190.35
I guess the question is am i being unreasonable with the price and time scale in my estimate for the labour?
Am i missing some big items in my estimate?
I have allowed 28mm tube for the gas run but that is for normal copper tube, Should I have been looking for a thicker walled copper tube as its run externally?
Generally why is their over a £1000 difference between my estimate and their quote?
Sorry for the long post but just thought i would ask the question on an AV forum

Also if anyone here knows of or is a plumber in the Nottingham area then recommendations are welcome.
Thanks in advance.