1. Join Now

    AVForums.com uses cookies. By continuing to use this site, you are agreeing to our use of cookies. Learn More.

ae 300 keystone correction

Discussion in 'Projectors, Screens & Video Processors' started by PIPO, Feb 17, 2003.

  1. PIPO

    PIPO
    Standard Member

    Joined:
    Oct 8, 2001
    Messages:
    18
    Products Owned:
    0
    Products Wanted:
    0
    Trophy Points:
    1
    Location:
    portugal
    Ratings:
    +0
    put my ae300 celing mounted at aprox. 2.5 metters from the screen. from the ideal place i deslocated about 1.5 m to the left.
    i did not inverted the pj, i use a tv support and i point him down.(2 mts from the floor)

    this is how i have to live with th pj. (or else the wife leaves)

    but the keystone shrinks too much and can not do a square shape. there are many incorrecions top/bottom and left/right side.

    guys..
    i need some help... what to do:confused:

    my room is very bright and the image is not perfect.
    what can i do to compensate this:suicide:



    PIPO
    ae300/portugal
     
  2. stevelup

    stevelup
    Well-known Member

    Joined:
    Aug 13, 2002
    Messages:
    6,118
    Products Owned:
    1
    Products Wanted:
    0
    Trophy Points:
    136
    Location:
    Swindon
    Ratings:
    +836
    Hi

    You definitely need to turn your projector upside down!

    There is no way you can achieve top-down projection on the AE300 with the projector mounted that way round.

    Steve
     

Share This Page

Loading...