Hi Guys,
Just started my first AV project, which consists of removing a load baring wall to make a through lounge. It started of with a few simple plans, but it turned out to be more complex than I first envisaged.
Firstly I had to get the plans drawn up and approved by the local council. Which was the simple part. The first problem was to find the builder to remove the wall between the two rooms. This took us 2 months!!
Before the demolition started without the furniture:
Day 1
An early start to the day for the builders. Firstly they had to put up the supports to hold up the ceiling and the joists. Then they started to knock down the wall, which took about an hour by one guy!!
Wall knocked down:
Day 2
The foundation was dug out, this measured 100cm deep by 750cm wide. This took a while, they had to use an industrial digger to go through the concrete.
They stripped the wallpaper, getting it ready to be skimmed. The skip failed to arrive, leaving our living room looking like a dumping ground
The foundation:
The dumping ground
Day 3
No builders today, so took this opportunity to run the wires for the wall lights and a ceiling light.
I also took this time to plan out the layout of the AV equipment and the furniture.
This is the proposed layout of the TV and the AV unit:
Proposed floor plan:
Anyone have any suggestions on the placement of the left surround speaker? Is it ok where it is? Or should I put it in the corner by the bay window?
Comments and suggestions are welcome!!