AVForums

Our philosophy in our forums, reviews, podcasts and feature videos is to promote audio and visual excellence by gathering and sharing the best information and resources available.

Help

To begin please visit our help section »

Not a Member Yet?

It only takes a minute to start enjoying the benefits of AVForums membership, and it's free!

Member Log in

Cinema 2 the next chapter!!

Post Reply
Old 15-05-2008, 9:52 PM   #1
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Cinema 2 the next chapter!!

And so it begins!

After 5 years at my old house and the cinema which i loved i have now been at the new house 3 weeks. Original idea was maybe not to bother doing a second cinema! shock horror, but then i quickly binned that one when i realised the room was a bit bigger and a space that would work so well!

Its going to be a long road, work has just begun and like many will only take place evening and weekend, although i am on hold for a hort while till i finish moving stuff about. I was lucky in that as it was a new build i got to specify my cabling all round the house, and also got the garage put in with a warm floor and all walls plastered except the door end which i needed for the moving process!

The first thing required was to get the main aircon unit in the loft space above the garage, thats now in and i need to then finish boarding the loft for general storage down one end. The rest of the loft is being closed off and airconditioned as a comms room (all needs insulating first) to house the 2 racks i will need for the cinema and multiroom system thats going in.

so a few pics:

The rear of the room:



Front:




So there we go, it will be a long road but thought you might like to see some early pics before things get going!

Last edited by X3ELS; 22-11-2009 at 8:52 PM. Reason: fixed photo links
  Quote
Old 15-05-2008, 10:02 PM   #2
Senior Member
 
SG-22's Avatar
Join Date: May 2007
Location: Cardiff
Experience Points:
8,500, Level: 22
Points: 8,500, Level: 22 Points: 8,500, Level: 22 Points: 8,500, Level: 22
Activity: 1.1%
Activity: 1.1% Activity: 1.1% Activity: 1.1%
Thanks: Gave 173, Got 220
Posts: 1,927
Re: Cinema 2 the next chapter!!

Looks like you've got enough cables to start with (and paint)

look forward to watching the room take shape
  Quote
Old 15-05-2008, 10:05 PM   #3
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by SG-22 View Post
Looks like you've got enough cables to start with (and paint)

look forward to watching the room take shape
LOL, yes thats about half of the main house cables, rest still in loft, original plan was a rack inside the room like my last one but there was going to be way to much kit, so now there will be no kit in the room, all in the loft instead.

Paint was leftovers from all the rooms in the house, handy for touching up!!
  Quote
Old 16-05-2008, 3:18 PM   #4
Prominent Member
 
Owen824's Avatar
Join Date: Aug 2006
Location: Edinburgh
Experience Points:
13,132, Level: 27
Points: 13,132, Level: 27 Points: 13,132, Level: 27 Points: 13,132, Level: 27
Activity: 2.7%
Activity: 2.7% Activity: 2.7% Activity: 2.7%
Thanks: Gave 185, Got 192
Posts: 4,392
Re: Cinema 2 the next chapter!!

Will be keeping a close eye on this as i feel this will be similar to what i am doing with my own place later this year.
  Quote
Old 16-05-2008, 3:41 PM   #5
Prominent Member
 
Kenny Glasgow's Avatar
Join Date: Apr 2004
Location: Livingston, Scotland
Experience Points:
12,077, Level: 26
Points: 12,077, Level: 26 Points: 12,077, Level: 26 Points: 12,077, Level: 26
Activity: 0.4%
Activity: 0.4% Activity: 0.4% Activity: 0.4%
Blog Entries: 1
Thanks: Gave 71, Got 228
Posts: 3,242
Re: Cinema 2 the next chapter!!

Good luck with the project Elliot
  Quote
Old 16-05-2008, 3:43 PM   #6
Assured Advertiser
 
hornydragon's Avatar
Join Date: Dec 2001
Location: Where ever you want me to be.
Experience Points:
63,997, Level: 61
Points: 63,997, Level: 61 Points: 63,997, Level: 61 Points: 63,997, Level: 61
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 102, Got 1,406
Posts: 28,088
Re: Cinema 2 the next chapter!!

I recon you'll at least a stone working in that small loft over the summer evenings mate......
  Quote
Old 18-05-2008, 8:58 AM   #7
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by hornydragon View Post
I recon you'll at least a stone working in that small loft over the summer evenings mate......
LOL, hence why its being airconned, i refuse to sweat off all that money i thoughtfully spent in the local pub!
  Quote
Old 18-05-2008, 1:41 PM   #8
Zag Zag is offline
Member
 
Zag's Avatar
Join Date: Jun 2004
Experience Points:
10,789, Level: 24
Points: 10,789, Level: 24 Points: 10,789, Level: 24 Points: 10,789, Level: 24
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 7, Got 46
Posts: 886
Re: Cinema 2 the next chapter!!

Elliot,

Best wishes for a speedy and trouble free build as possible.

I will be keeping a close eye on how you go about this, as I may convert my garage in the near future.

Zag
  Quote
Old 18-05-2008, 2:53 PM   #9
Ex Member
Join Date: May 2007
Location: ideal home cinema dem room
Experience Points:
24,693, Level: 38
Points: 24,693, Level: 38 Points: 24,693, Level: 38 Points: 24,693, Level: 38
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 639, Got 546
Posts: 5,352
Re: Cinema 2 the next chapter!!

Hi Elliot

It nice to see someone in the "trade" doing something like this so all us newbies can see what to really do.

looks like it gonna be a very interesting project this one so good luck with it .

Cheers Al
  Quote
Old 17-07-2008, 10:05 PM   #10
Prominent Member
 
ReTrO's Avatar
Join Date: Jul 2000
Location: High Wycombe, Bucks, UK
Experience Points:
15,958, Level: 30
Points: 15,958, Level: 30 Points: 15,958, Level: 30 Points: 15,958, Level: 30
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 14, Got 51
Posts: 3,372
Re: Cinema 2 the next chapter!!

How's progress?
  Quote
Old 17-07-2008, 10:14 PM   #11
Conspicuous Member
 
Gary Lightfoot's Avatar
Join Date: Apr 2001
Location: Surrey. UK.
Experience Points:
27,928, Level: 40
Points: 27,928, Level: 40 Points: 27,928, Level: 40 Points: 27,928, Level: 40
Activity: 18.2%
Activity: 18.2% Activity: 18.2% Activity: 18.2%
Thanks: Gave 42, Got 519
Posts: 8,513
Re: Cinema 2 the next chapter!!

Hi Elliot,

What are the room dimensions, and what kind of set up will you be doing? Going 'Scope?

Gary
  Quote
Old 31-10-2008, 4:39 PM   #12
Prominent Member
 
ReTrO's Avatar
Join Date: Jul 2000
Location: High Wycombe, Bucks, UK
Experience Points:
15,958, Level: 30
Points: 15,958, Level: 30 Points: 15,958, Level: 30 Points: 15,958, Level: 30
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 14, Got 51
Posts: 3,372
Re: Cinema 2 the next chapter!!

Any new photos of your slow but steady progress?
  Quote
Old 01-11-2008, 9:14 PM   #13
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

No photos yet, patience young staff member

And yes Gary it will be scope, i will be doing an update soon with all the dims, my time has been spent on the multiroom part at present....
  Quote
Old 24-05-2009, 8:27 PM   #14
Distinguished Member
 
Smurfin's Avatar
Join Date: Aug 2002
Location: Somewhere
Experience Points:
41,902, Level: 50
Points: 41,902, Level: 50 Points: 41,902, Level: 50 Points: 41,902, Level: 50
Activity: 23.5%
Activity: 23.5% Activity: 23.5% Activity: 23.5%
Thanks: Gave 565, Got 896
Posts: 13,609
Re: Cinema 2 the next chapter!!

So where's the new chapter then elliot, the posts say 2008
  Quote
Old 24-05-2009, 9:06 PM   #15
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Ok, so i have been working the proverbials off on this every night after work and every weekend for approx 7 weeks now, i have a deadline to hit on the arrival of another baby so theres motivation there!!

Its really well on the way now and i am really really pleased with the results, the quality is way beyond the build of the last room and a complete acoustic design had been done prior to anything being started. In fact the design took on and off 6 months to make sure it was going to be just right.

I have spent a lot of time consulting with a collague who has built several THX cinemas as well as having his name to loads of Music and film mastering suites so i could get the target response i wanted.

Here is the recommended decay time. This is for a studio control room which is pretty close to where you want a multi-channel environment.

RT60 (ITU/EBU Control Room Recommended): 174 ms
- ±50ms from 200Hz to 4kHz = 124 to 224ms
- <+200ms at 63hz = 374ms
- 200<RT60<400ms

Based on my calculations and with my treatment placements and type this is my calculated outcome.

Frequency 125 250 500 1k 2k 4k
Sabins 209 267 342 350 352 352
% of Average 67% 86% 110% 112% 113% 113%
RT60 0.28 0.22 0.17 0.17 0.17 0.16

As you can see, we're pretty much right where we want to be across the spectrum. This room will be very dynamic and clean with good dialog intelligibility and solid deep tight bass. Extrapolated RT at 63Hz will be somewhere around 350ms.

Rather than spend the next 3 weeks posting images and comments i have put brief remarks on some images and uploaded them to photobucket, any queries then please feel free to drop an image into this thread and ask away

Images here:

Image hosting, free photo sharing & video sharing at Photobucket
  Quote
Old 24-05-2009, 9:21 PM   #16
Distinguished Member
 
Smurfin's Avatar
Join Date: Aug 2002
Location: Somewhere
Experience Points:
41,902, Level: 50
Points: 41,902, Level: 50 Points: 41,902, Level: 50 Points: 41,902, Level: 50
Activity: 23.5%
Activity: 23.5% Activity: 23.5% Activity: 23.5%
Thanks: Gave 565, Got 896
Posts: 13,609
Re: Cinema 2 the next chapter!!

Looks awesome so far What's the material you've used for the coverings? And in terms of acoustic panels, have you made them yourself or are you buying them?
  Quote
Old 24-05-2009, 9:26 PM   #17
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Wall coverings will be alcantara, no pics of that up yet.

Ceiling is GOM, (Guildford of Maine) and then of course speaker fabric where necessary, the treatment is varying depths of 60kg density mineral wool in the correct locations with an fsk facing applied accordingly, fabric will then be applied over this to hide it, so yes all made in house
  Quote
Old 24-05-2009, 9:40 PM   #18
Senior Member
Join Date: Jun 2003
Location: London
Experience Points:
8,417, Level: 21
Points: 8,417, Level: 21 Points: 8,417, Level: 21 Points: 8,417, Level: 21
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 49, Got 317
Posts: 1,969
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by X3ELS View Post
Put the images in the thread you lazy so and so
  Quote
Old 24-05-2009, 9:46 PM   #19
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by lfletcher View Post
Put the images in the thread you lazy so and so
didnt really want to whack 80 photos in here!

i will add all new ones into the thread just to keep you happy mr F
  Quote
Old 24-05-2009, 10:05 PM   #20
Senior Member
Join Date: Jun 2003
Location: London
Experience Points:
8,417, Level: 21
Points: 8,417, Level: 21 Points: 8,417, Level: 21 Points: 8,417, Level: 21
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 49, Got 317
Posts: 1,969
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by X3ELS View Post
i will add all new ones into the thread just to keep you happy mr F
Good lad, now show us the twinkly lights!
  Quote
Old 24-05-2009, 10:17 PM   #21
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by lfletcher View Post
Good lad, now show us the twinkly lights!
Ok quick pic for you, its a Numinus star ceiling, first in the Uk and is just stunning in the way it twinkles, v difficult to photograph and the big black area is the loft hatch location...

  Quote
Old 24-05-2009, 10:58 PM   #22
Prominent Member
 
ReTrO's Avatar
Join Date: Jul 2000
Location: High Wycombe, Bucks, UK
Experience Points:
15,958, Level: 30
Points: 15,958, Level: 30 Points: 15,958, Level: 30 Points: 15,958, Level: 30
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 14, Got 51
Posts: 3,372
Re: Cinema 2 the next chapter!!

Looking good/dark!
  Quote
Old 25-05-2009, 12:25 PM   #23
Member
Join Date: Jan 2005
Experience Points:
3,718, Level: 14
Points: 3,718, Level: 14 Points: 3,718, Level: 14 Points: 3,718, Level: 14
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 21, Got 55
Posts: 493
Re: Cinema 2 the next chapter!!

That looks great. What is fsk?
  Quote
Old 25-05-2009, 3:18 PM   #24
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by Da_Rude_Baboon View Post
That looks great. What is fsk?
Thanks its been a lot of hard work!

FSK stands for foil skrim kraft, its the material that is applied to the areas of the room where i want to reflect the upper frequencies so it does not become to dead in the room. Almost all 'treated' rooms i here are just wall to ceiling sound treatment and they sound like anachoic chambers, thats the difference between a havily damped room and a properly 'treated' room.
  Quote
Thanks from:
Da_Rude_Baboon (26-05-2009)
Old 25-05-2009, 11:44 PM   #25
Member
 
Isco 3's Avatar
Join Date: Dec 2006
Location: North West
Experience Points:
6,129, Level: 18
Points: 6,129, Level: 18 Points: 6,129, Level: 18 Points: 6,129, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 1, Got 36
Posts: 416
Re: Cinema 2 the next chapter!!

Hi Elliot,

why didn't you use the recommended RT times provided by the ITU standards for a multi channel listening room? Also, the audience will be a very large absorbing area. Have you considered that in your calculations?

Great work, by the way.
  Quote
Old 26-05-2009, 10:22 PM   #26
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Re: Cinema 2 the next chapter!!

Quote:
Originally Posted by Isco 3 View Post
Hi Elliot,

why didn't you use the recommended RT times provided by the ITU standards for a multi channel listening room? Also, the audience will be a very large absorbing area. Have you considered that in your calculations?

Great work, by the way.
Actually, I consider both. I know what I like and don't think either really hits that mark IMO. They're both relatively close but still different, and yes the room has designed for 2 people viewing primarily, and 4 microfibre seats.

Aiming to complete now within the next 3 weeks or so....
  Quote
Old 14-06-2009, 8:20 AM   #27
Senior Member
 
Pulsar's Avatar
Join Date: Jan 2003
Location: West Midlands - Stourbridge
Experience Points:
8,032, Level: 21
Points: 8,032, Level: 21 Points: 8,032, Level: 21 Points: 8,032, Level: 21
Activity: 1.0%
Activity: 1.0% Activity: 1.0% Activity: 1.0%
Thanks: Gave 60, Got 22
Posts: 2,173
Re: Cinema 2 the next chapter!!

Hi Elliot,

How's it coming along? I think Richard may have mentioned that I'm planning on acoustically treating my new room, albeit nowhere near as scientifically as you. I've been reading various articles on the web and just planned to treat the 1st and 2nd reflection points, front wall (probably back) and add some corner fill for bass. Beyond this I don't know what else I should do, such as where to use diffusion etc. That FSK material you've used looks interesting too.

Anyway, do you have a few pearls of wisdom you can share about room treatments and their placements? I'm definitely looking for the DIY option more than off the shelf products.

Finally, are you going for 5.1 or 7.1?

Cheers

Rob
  Quote
Old 22-11-2009, 8:25 PM   #28
Senior Member
 
X3ELS's Avatar
Join Date: May 2002
Location: Surrey
Experience Points:
7,654, Level: 20
Points: 7,654, Level: 20 Points: 7,654, Level: 20 Points: 7,654, Level: 20
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 12, Got 111
Posts: 1,135
Ok Chaps, its been really pants that i havent kept this updated, however the good news is that the room is now complete and running

Obviously these photos were not designed to show the picture quality, just the room.

Let me know what you think!











  Quote
Old 22-11-2009, 8:45 PM   #29
Senior Member
 
alz2605's Avatar
Join Date: Sep 2007
Location: Degabah, Cymru
Experience Points:
5,861, Level: 18
Points: 5,861, Level: 18 Points: 5,861, Level: 18 Points: 5,861, Level: 18
Activity: 2.3%
Activity: 2.3% Activity: 2.3% Activity: 2.3%
Thanks: Gave 279, Got 315
Posts: 1,261
Holy cow that is amazing! Nice one mate
  Quote
Old 22-11-2009, 8:55 PM   #30
Member
Join Date: Dec 2007
Experience Points:
1,716, Level: 9
Points: 1,716, Level: 9 Points: 1,716, Level: 9 Points: 1,716, Level: 9
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
Thanks: Gave 3, Got 4
Posts: 101
The room looks fantastic

What pj are you using and how is it being driven?
  Quote
Post Reply



Thread information and display options
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off