Not very interesting update but.....

Wired in a couple of the smoke detectors, one upstairs in the house, with a 1mm 3core & earth link to one downstairs. So if one goes off they both go off Safety first boys and girls...

Air-con unit is ordered, got the last one of this model here:

http://www.global-cooling.co.uk/mill...rter-12000.php

Should do the honours I think....
These guys were very helpful and responded very quickly to my questions by email.

I must admit that it was a bit more expensive then I had planned for, after originally reading threads on here about air-con and seeing the cheapo units on ebay. But of course I needed two indoor units so cha-ching, up goes the cost. Plus this is an inverter model which basically means it can vary it's cooling/heating output by varying the speed of the compressor. (cha-ching) The cheapo units just switch on and off to regulate the temperature, so are noisier and have less precise temperature control. (apparently). Global Cooling also hire out a vaccum pump and cutting/flaring tools so that you can make up the refrigerent pipes to the exact length needed, just like a pro install.

I now plan to run some conduit for the projector signal cable, I'll probably use 40mm pushfit waste pipe unless anybody thinks that's a bad idea? There will be about 4 swept bends in the pipe to get from the middle of the room to the equipment rack cupboard.
For now I'll just run a draw-rope through it and pull the cable through later (I hope )

Ben